From September 2025 to February 2026, our team were on site supporting CHINT Green Energy New Zealand, delivering key electrical works across the Tatuanui Solar Farm. It was all hands on deck to keep the project on track through rain, mud, and sunshine.
Our contributions included:
• Connection of modules and installation of DC string cabling
• Installation of LV AC cabling from smart inverters to transformers
• Installation of MV cables
• Installation, connection, and labelling of 22 Smart String Inverters
• Earthing systems, including cabling with underground crimps
• Transformer station earthing grids
• Auxiliary power supplies, mag slab and warning tape protection
• Communications and fibre cabling
• Installation of lighting poles,
• Installation of weather, meteorological, and hydrologic stations
• Testing, QA, and site management & logistics
• Supply and installation of engraved, weatherproof labels
Tatuanui Solar Farm will play a key role in supporting local renewable energy infrastructure. And, being in the heart of New Zealand's prime dairying region, it will supply around one third of the Tatua milk processing plant’s electricity requirements.